SSL Report: drumsproject.eu (134.102.23.192)
Assessed on:  Mon, 22 Sep 2025 12:24:07 UTC | Clear cache

Due to a recently discovered bug in Apple's code, your browser is exposed to MITM attacks. Click here for more information.

Summary
Overall Rating
B
0
20
40
60
80
100
Certificate
 
Protocol Support
 
Key Exchange
 
Cipher Strength
 

Visit our documentation page for more information, configuration guides, and books. Known issues are documented here.
This server does not support Forward Secrecy with the reference browsers. Grade capped to B.  MORE INFO »
This server supports TLS 1.3.  MORE INFO »
HTTP Strict Transport Security (HSTS) with long duration deployed on this server.  MORE INFO »
Certificate #1: RSA 4096 bits (SHA384withRSA)
Server Key and Certificate #1
Subject drumsproject.eu
Fingerprint SHA256: aaf8f059fcfa9ebccc99e74d22e50d514313189952f8090780cf1f518e19e893
Pin SHA256: htQgkKkvUsRMiCC1VCNYOq7rDoASV6JVwr0R9LUKv8U=
Common names drumsproject.eu
Alternative names drumsproject.eu drums.bime.de
Serial Number 00eb152ac6e797dc590037a2f272b94a07
Valid from Mon, 09 Dec 2024 00:00:00 UTC
Valid until Tue, 09 Dec 2025 23:59:59 UTC (expires in 2 months and 17 days)
Key RSA 4096 bits (e 65537)
Weak key (Debian) No
Issuer GEANT OV RSA CA 4
AIA: http://GEANT.crt.sectigo.com/GEANTOVRSACA4.crt
Signature algorithm SHA384withRSA
Extended Validation No
Certificate Transparency Yes (certificate)
OCSP Must Staple No
Revocation information CRL, OCSP
CRL: http://GEANT.crl.sectigo.com/GEANTOVRSACA4.crl
OCSP: http://GEANT.ocsp.sectigo.com
Revocation status Good (not revoked)
DNS CAA No (more info)
Trusted Yes
Mozilla  Apple  Android  Java  Windows 


Additional Certificates (if supplied)
Certificates provided 5 (8536 bytes)
Chain issues Incorrect order, Extra certs, Contains anchor
#2
Subject drumsproject.eu
Fingerprint SHA256: aaf8f059fcfa9ebccc99e74d22e50d514313189952f8090780cf1f518e19e893
Pin SHA256: htQgkKkvUsRMiCC1VCNYOq7rDoASV6JVwr0R9LUKv8U=
Valid until Tue, 09 Dec 2025 23:59:59 UTC (expires in 2 months and 17 days)
Key RSA 4096 bits (e 65537)
Issuer GEANT OV RSA CA 4
Signature algorithm SHA384withRSA
#3
Subject GEANT OV RSA CA 4
Fingerprint SHA256: 37834fa5ea40fbf7b61196955962e1ca0558872435e4206653d3f620dd8e988e
Pin SHA256: j0qRK9S0oUba9b4ttZdKp42Q4T2J8S4FFKPNG5FTFVA=
Valid until Sun, 01 May 2033 23:59:59 UTC (expires in 7 years and 7 months)
Key RSA 4096 bits (e 65537)
Issuer USERTrust RSA Certification Authority
Signature algorithm SHA384withRSA
#4
Subject USERTrust RSA Certification Authority
Fingerprint SHA256: 68b9c761219a5b1f0131784474665db61bbdb109e00f05ca9f74244ee5f5f52b
Pin SHA256: x4QzPSC810K5/cMjb05Qm4k3Bw5zBn4lTdO/nEW/Td4=
Valid until Sun, 31 Dec 2028 23:59:59 UTC (expires in 3 years and 3 months)
Key RSA 4096 bits (e 65537)
Issuer AAA Certificate Services
Signature algorithm SHA384withRSA
#5
Subject AAA Certificate Services   In trust store
Fingerprint SHA256: d7a7a0fb5d7e2731d771e9484ebcdef71d5f0c3e0a2948782bc83ee0ea699ef4
Pin SHA256: vRU+17BDT2iGsXvOi76E7TQMcTLXAqj0+jGPdW7L1vM=
Valid until Sun, 31 Dec 2028 23:59:59 UTC (expires in 3 years and 3 months)
Key RSA 2048 bits (e 65537)
Issuer AAA Certificate Services   Self-signed
Signature algorithm SHA1withRSA   Weak, but no impact on root certificate


Certification Paths
Path #1: Trusted
1 Sent by server drumsproject.eu
Fingerprint SHA256: aaf8f059fcfa9ebccc99e74d22e50d514313189952f8090780cf1f518e19e893
Pin SHA256: htQgkKkvUsRMiCC1VCNYOq7rDoASV6JVwr0R9LUKv8U=

RSA 4096 bits (e 65537) / SHA384withRSA
2 Sent by server GEANT OV RSA CA 4
Fingerprint SHA256: 37834fa5ea40fbf7b61196955962e1ca0558872435e4206653d3f620dd8e988e
Pin SHA256: j0qRK9S0oUba9b4ttZdKp42Q4T2J8S4FFKPNG5FTFVA=

RSA 4096 bits (e 65537) / SHA384withRSA
3 In trust store USERTrust RSA Certification Authority   Self-signed
Fingerprint SHA256: e793c9b02fd8aa13e21c31228accb08119643b749c898964b1746d46c3d4cbd2
Pin SHA256: x4QzPSC810K5/cMjb05Qm4k3Bw5zBn4lTdO/nEW/Td4=

RSA 4096 bits (e 65537) / SHA384withRSA
Path #2: Trusted
1 Sent by server drumsproject.eu
Fingerprint SHA256: aaf8f059fcfa9ebccc99e74d22e50d514313189952f8090780cf1f518e19e893
Pin SHA256: htQgkKkvUsRMiCC1VCNYOq7rDoASV6JVwr0R9LUKv8U=

RSA 4096 bits (e 65537) / SHA384withRSA
2 Sent by server GEANT OV RSA CA 4
Fingerprint SHA256: 37834fa5ea40fbf7b61196955962e1ca0558872435e4206653d3f620dd8e988e
Pin SHA256: j0qRK9S0oUba9b4ttZdKp42Q4T2J8S4FFKPNG5FTFVA=

RSA 4096 bits (e 65537) / SHA384withRSA
3 Sent by server USERTrust RSA Certification Authority
Fingerprint SHA256: 68b9c761219a5b1f0131784474665db61bbdb109e00f05ca9f74244ee5f5f52b
Pin SHA256: x4QzPSC810K5/cMjb05Qm4k3Bw5zBn4lTdO/nEW/Td4=

RSA 4096 bits (e 65537) / SHA384withRSA
4 Sent by server
In trust store
AAA Certificate Services   Self-signed
Fingerprint SHA256: d7a7a0fb5d7e2731d771e9484ebcdef71d5f0c3e0a2948782bc83ee0ea699ef4
Pin SHA256: vRU+17BDT2iGsXvOi76E7TQMcTLXAqj0+jGPdW7L1vM=

RSA 2048 bits (e 65537) / SHA1withRSA
Weak or insecure signature, but no impact on root certificate
Path #1: Trusted
1 Sent by server drumsproject.eu
Fingerprint SHA256: aaf8f059fcfa9ebccc99e74d22e50d514313189952f8090780cf1f518e19e893
Pin SHA256: htQgkKkvUsRMiCC1VCNYOq7rDoASV6JVwr0R9LUKv8U=

RSA 4096 bits (e 65537) / SHA384withRSA
2 Sent by server GEANT OV RSA CA 4
Fingerprint SHA256: 37834fa5ea40fbf7b61196955962e1ca0558872435e4206653d3f620dd8e988e
Pin SHA256: j0qRK9S0oUba9b4ttZdKp42Q4T2J8S4FFKPNG5FTFVA=

RSA 4096 bits (e 65537) / SHA384withRSA
3 In trust store USERTrust RSA Certification Authority   Self-signed
Fingerprint SHA256: e793c9b02fd8aa13e21c31228accb08119643b749c898964b1746d46c3d4cbd2
Pin SHA256: x4QzPSC810K5/cMjb05Qm4k3Bw5zBn4lTdO/nEW/Td4=

RSA 4096 bits (e 65537) / SHA384withRSA
Path #2: Trusted
1 Sent by server drumsproject.eu
Fingerprint SHA256: aaf8f059fcfa9ebccc99e74d22e50d514313189952f8090780cf1f518e19e893
Pin SHA256: htQgkKkvUsRMiCC1VCNYOq7rDoASV6JVwr0R9LUKv8U=

RSA 4096 bits (e 65537) / SHA384withRSA
2 Sent by server GEANT OV RSA CA 4
Fingerprint SHA256: 37834fa5ea40fbf7b61196955962e1ca0558872435e4206653d3f620dd8e988e
Pin SHA256: j0qRK9S0oUba9b4ttZdKp42Q4T2J8S4FFKPNG5FTFVA=

RSA 4096 bits (e 65537) / SHA384withRSA
3 Sent by server USERTrust RSA Certification Authority
Fingerprint SHA256: 68b9c761219a5b1f0131784474665db61bbdb109e00f05ca9f74244ee5f5f52b
Pin SHA256: x4QzPSC810K5/cMjb05Qm4k3Bw5zBn4lTdO/nEW/Td4=

RSA 4096 bits (e 65537) / SHA384withRSA
4 Sent by server
In trust store
AAA Certificate Services   Self-signed
Fingerprint SHA256: d7a7a0fb5d7e2731d771e9484ebcdef71d5f0c3e0a2948782bc83ee0ea699ef4
Pin SHA256: vRU+17BDT2iGsXvOi76E7TQMcTLXAqj0+jGPdW7L1vM=

RSA 2048 bits (e 65537) / SHA1withRSA
Weak or insecure signature, but no impact on root certificate
Path #1: Trusted
1 Sent by server drumsproject.eu
Fingerprint SHA256: aaf8f059fcfa9ebccc99e74d22e50d514313189952f8090780cf1f518e19e893
Pin SHA256: htQgkKkvUsRMiCC1VCNYOq7rDoASV6JVwr0R9LUKv8U=

RSA 4096 bits (e 65537) / SHA384withRSA
2 Sent by server GEANT OV RSA CA 4
Fingerprint SHA256: 37834fa5ea40fbf7b61196955962e1ca0558872435e4206653d3f620dd8e988e
Pin SHA256: j0qRK9S0oUba9b4ttZdKp42Q4T2J8S4FFKPNG5FTFVA=

RSA 4096 bits (e 65537) / SHA384withRSA
3 In trust store USERTrust RSA Certification Authority   Self-signed
Fingerprint SHA256: e793c9b02fd8aa13e21c31228accb08119643b749c898964b1746d46c3d4cbd2
Pin SHA256: x4QzPSC810K5/cMjb05Qm4k3Bw5zBn4lTdO/nEW/Td4=

RSA 4096 bits (e 65537) / SHA384withRSA
Path #2: Trusted
1 Sent by server drumsproject.eu
Fingerprint SHA256: aaf8f059fcfa9ebccc99e74d22e50d514313189952f8090780cf1f518e19e893
Pin SHA256: htQgkKkvUsRMiCC1VCNYOq7rDoASV6JVwr0R9LUKv8U=

RSA 4096 bits (e 65537) / SHA384withRSA
2 Sent by server GEANT OV RSA CA 4
Fingerprint SHA256: 37834fa5ea40fbf7b61196955962e1ca0558872435e4206653d3f620dd8e988e
Pin SHA256: j0qRK9S0oUba9b4ttZdKp42Q4T2J8S4FFKPNG5FTFVA=

RSA 4096 bits (e 65537) / SHA384withRSA
3 Sent by server USERTrust RSA Certification Authority
Fingerprint SHA256: 68b9c761219a5b1f0131784474665db61bbdb109e00f05ca9f74244ee5f5f52b
Pin SHA256: x4QzPSC810K5/cMjb05Qm4k3Bw5zBn4lTdO/nEW/Td4=

RSA 4096 bits (e 65537) / SHA384withRSA
4 Sent by server
In trust store
AAA Certificate Services   Self-signed
Fingerprint SHA256: d7a7a0fb5d7e2731d771e9484ebcdef71d5f0c3e0a2948782bc83ee0ea699ef4
Pin SHA256: vRU+17BDT2iGsXvOi76E7TQMcTLXAqj0+jGPdW7L1vM=

RSA 2048 bits (e 65537) / SHA1withRSA
Weak or insecure signature, but no impact on root certificate
Path #1: Trusted
1 Sent by server drumsproject.eu
Fingerprint SHA256: aaf8f059fcfa9ebccc99e74d22e50d514313189952f8090780cf1f518e19e893
Pin SHA256: htQgkKkvUsRMiCC1VCNYOq7rDoASV6JVwr0R9LUKv8U=

RSA 4096 bits (e 65537) / SHA384withRSA
2 Sent by server GEANT OV RSA CA 4
Fingerprint SHA256: 37834fa5ea40fbf7b61196955962e1ca0558872435e4206653d3f620dd8e988e
Pin SHA256: j0qRK9S0oUba9b4ttZdKp42Q4T2J8S4FFKPNG5FTFVA=

RSA 4096 bits (e 65537) / SHA384withRSA
3 In trust store USERTrust RSA Certification Authority   Self-signed
Fingerprint SHA256: e793c9b02fd8aa13e21c31228accb08119643b749c898964b1746d46c3d4cbd2
Pin SHA256: x4QzPSC810K5/cMjb05Qm4k3Bw5zBn4lTdO/nEW/Td4=

RSA 4096 bits (e 65537) / SHA384withRSA
Path #2: Trusted
1 Sent by server drumsproject.eu
Fingerprint SHA256: aaf8f059fcfa9ebccc99e74d22e50d514313189952f8090780cf1f518e19e893
Pin SHA256: htQgkKkvUsRMiCC1VCNYOq7rDoASV6JVwr0R9LUKv8U=

RSA 4096 bits (e 65537) / SHA384withRSA
2 Sent by server GEANT OV RSA CA 4
Fingerprint SHA256: 37834fa5ea40fbf7b61196955962e1ca0558872435e4206653d3f620dd8e988e
Pin SHA256: j0qRK9S0oUba9b4ttZdKp42Q4T2J8S4FFKPNG5FTFVA=

RSA 4096 bits (e 65537) / SHA384withRSA
3 Sent by server USERTrust RSA Certification Authority
Fingerprint SHA256: 68b9c761219a5b1f0131784474665db61bbdb109e00f05ca9f74244ee5f5f52b
Pin SHA256: x4QzPSC810K5/cMjb05Qm4k3Bw5zBn4lTdO/nEW/Td4=

RSA 4096 bits (e 65537) / SHA384withRSA
4 Sent by server
In trust store
AAA Certificate Services   Self-signed
Fingerprint SHA256: d7a7a0fb5d7e2731d771e9484ebcdef71d5f0c3e0a2948782bc83ee0ea699ef4
Pin SHA256: vRU+17BDT2iGsXvOi76E7TQMcTLXAqj0+jGPdW7L1vM=

RSA 2048 bits (e 65537) / SHA1withRSA
Weak or insecure signature, but no impact on root certificate
Path #1: Trusted
1 Sent by server drumsproject.eu
Fingerprint SHA256: aaf8f059fcfa9ebccc99e74d22e50d514313189952f8090780cf1f518e19e893
Pin SHA256: htQgkKkvUsRMiCC1VCNYOq7rDoASV6JVwr0R9LUKv8U=

RSA 4096 bits (e 65537) / SHA384withRSA
2 Sent by server GEANT OV RSA CA 4
Fingerprint SHA256: 37834fa5ea40fbf7b61196955962e1ca0558872435e4206653d3f620dd8e988e
Pin SHA256: j0qRK9S0oUba9b4ttZdKp42Q4T2J8S4FFKPNG5FTFVA=

RSA 4096 bits (e 65537) / SHA384withRSA
3 In trust store USERTrust RSA Certification Authority   Self-signed
Fingerprint SHA256: e793c9b02fd8aa13e21c31228accb08119643b749c898964b1746d46c3d4cbd2
Pin SHA256: x4QzPSC810K5/cMjb05Qm4k3Bw5zBn4lTdO/nEW/Td4=

RSA 4096 bits (e 65537) / SHA384withRSA
Path #2: Trusted
1 Sent by server drumsproject.eu
Fingerprint SHA256: aaf8f059fcfa9ebccc99e74d22e50d514313189952f8090780cf1f518e19e893
Pin SHA256: htQgkKkvUsRMiCC1VCNYOq7rDoASV6JVwr0R9LUKv8U=

RSA 4096 bits (e 65537) / SHA384withRSA
2 Sent by server GEANT OV RSA CA 4
Fingerprint SHA256: 37834fa5ea40fbf7b61196955962e1ca0558872435e4206653d3f620dd8e988e
Pin SHA256: j0qRK9S0oUba9b4ttZdKp42Q4T2J8S4FFKPNG5FTFVA=

RSA 4096 bits (e 65537) / SHA384withRSA
3 Sent by server USERTrust RSA Certification Authority
Fingerprint SHA256: 68b9c761219a5b1f0131784474665db61bbdb109e00f05ca9f74244ee5f5f52b
Pin SHA256: x4QzPSC810K5/cMjb05Qm4k3Bw5zBn4lTdO/nEW/Td4=

RSA 4096 bits (e 65537) / SHA384withRSA
4 Sent by server
In trust store
AAA Certificate Services   Self-signed
Fingerprint SHA256: d7a7a0fb5d7e2731d771e9484ebcdef71d5f0c3e0a2948782bc83ee0ea699ef4
Pin SHA256: vRU+17BDT2iGsXvOi76E7TQMcTLXAqj0+jGPdW7L1vM=

RSA 2048 bits (e 65537) / SHA1withRSA
Weak or insecure signature, but no impact on root certificate

Click here to expand

Configuration
Protocols
TLS 1.3 Yes
TLS 1.2 Yes
TLS 1.1 No
TLS 1.0 No
SSL 3 No
SSL 2 No


Cipher Suites
# TLS 1.3 (server has no preference)
TLS_AES_128_GCM_SHA256 (0x1301)   ECDH x25519 (eq. 3072 bits RSA)   FS 128
TLS_AES_256_GCM_SHA384 (0x1302)   ECDH x25519 (eq. 3072 bits RSA)   FS 256
TLS_CHACHA20_POLY1305_SHA256 (0x1303)   ECDH x25519 (eq. 3072 bits RSA)   FS 256
# TLS 1.2 (server has no preference)
TLS_RSA_WITH_AES_128_CBC_SHA (0x2f)   WEAK 128
TLS_DHE_RSA_WITH_AES_128_CBC_SHA (0x33)   DH 4096 bits   FS   WEAK 128
TLS_RSA_WITH_CAMELLIA_128_CBC_SHA (0x41)   WEAK 128
TLS_DHE_RSA_WITH_CAMELLIA_128_CBC_SHA (0x45)   DH 4096 bits   FS   WEAK 128
TLS_ECDHE_RSA_WITH_AES_128_CBC_SHA (0xc013)   ECDH secp521r1 (eq. 15360 bits RSA)   FS   WEAK 128
TLS_RSA_WITH_AES_128_CBC_SHA256 (0x3c)   WEAK 128
TLS_DHE_RSA_WITH_AES_128_CBC_SHA256 (0x67)   DH 4096 bits   FS   WEAK 128
TLS_RSA_WITH_AES_128_GCM_SHA256 (0x9c)   WEAK 128
TLS_DHE_RSA_WITH_AES_128_GCM_SHA256 (0x9e)   DH 4096 bits   FS 128
TLS_RSA_WITH_CAMELLIA_128_CBC_SHA256 (0xba)   WEAK 128
TLS_DHE_RSA_WITH_CAMELLIA_128_CBC_SHA256 (0xbe)   DH 4096 bits   FS   WEAK 128
TLS_ECDHE_RSA_WITH_AES_128_CBC_SHA256 (0xc027)   ECDH secp521r1 (eq. 15360 bits RSA)   FS   WEAK 128
TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256 (0xc02f)   ECDH secp521r1 (eq. 15360 bits RSA)   FS 128
TLS_RSA_WITH_ARIA_128_GCM_SHA256 (0xc050)   WEAK 128
TLS_DHE_RSA_WITH_ARIA_128_GCM_SHA256 (0xc052)   DH 4096 bits   FS 128
TLS_ECDHE_RSA_WITH_ARIA_128_GCM_SHA256 (0xc060)   ECDH secp521r1 (eq. 15360 bits RSA)   FS 128
TLS_ECDHE_RSA_WITH_CAMELLIA_128_CBC_SHA256 (0xc076)   ECDH secp521r1 (eq. 15360 bits RSA)   FS   WEAK 128
TLS_RSA_WITH_AES_128_CCM (0xc09c)   WEAK 128
TLS_DHE_RSA_WITH_AES_128_CCM (0xc09e)   DH 4096 bits   FS 128
TLS_RSA_WITH_AES_128_CCM_8 (0xc0a0)   WEAK 128
TLS_DHE_RSA_WITH_AES_128_CCM_8 (0xc0a2)   DH 4096 bits   FS 128
TLS_RSA_WITH_AES_256_CBC_SHA (0x35)   WEAK 256
TLS_DHE_RSA_WITH_AES_256_CBC_SHA (0x39)   DH 4096 bits   FS   WEAK 256
TLS_RSA_WITH_CAMELLIA_256_CBC_SHA (0x84)   WEAK 256
TLS_DHE_RSA_WITH_CAMELLIA_256_CBC_SHA (0x88)   DH 4096 bits   FS   WEAK 256
TLS_ECDHE_RSA_WITH_AES_256_CBC_SHA (0xc014)   ECDH secp521r1 (eq. 15360 bits RSA)   FS   WEAK 256
TLS_RSA_WITH_AES_256_CBC_SHA256 (0x3d)   WEAK 256
TLS_DHE_RSA_WITH_AES_256_CBC_SHA256 (0x6b)   DH 4096 bits   FS   WEAK 256
TLS_RSA_WITH_AES_256_GCM_SHA384 (0x9d)   WEAK 256
TLS_DHE_RSA_WITH_AES_256_GCM_SHA384 (0x9f)   DH 4096 bits   FS 256
TLS_RSA_WITH_CAMELLIA_256_CBC_SHA256 (0xc0)   WEAK 256
TLS_DHE_RSA_WITH_CAMELLIA_256_CBC_SHA256 (0xc4)   DH 4096 bits   FS   WEAK 256
TLS_ECDHE_RSA_WITH_AES_256_CBC_SHA384 (0xc028)   ECDH secp521r1 (eq. 15360 bits RSA)   FS   WEAK 256
TLS_ECDHE_RSA_WITH_AES_256_GCM_SHA384 (0xc030)   ECDH secp521r1 (eq. 15360 bits RSA)   FS 256
TLS_RSA_WITH_ARIA_256_GCM_SHA384 (0xc051)   WEAK 256
TLS_DHE_RSA_WITH_ARIA_256_GCM_SHA384 (0xc053)   DH 4096 bits   FS 256
TLS_ECDHE_RSA_WITH_ARIA_256_GCM_SHA384 (0xc061)   ECDH secp521r1 (eq. 15360 bits RSA)   FS 256
TLS_ECDHE_RSA_WITH_CAMELLIA_256_CBC_SHA384 (0xc077)   ECDH secp521r1 (eq. 15360 bits RSA)   FS   WEAK 256
TLS_RSA_WITH_AES_256_CCM (0xc09d)   WEAK 256
TLS_DHE_RSA_WITH_AES_256_CCM (0xc09f)   DH 4096 bits   FS 256
TLS_RSA_WITH_AES_256_CCM_8 (0xc0a1)   WEAK 256
TLS_DHE_RSA_WITH_AES_256_CCM_8 (0xc0a3)   DH 4096 bits   FS 256
TLS_ECDHE_RSA_WITH_CHACHA20_POLY1305_SHA256 (0xcca8)   ECDH secp521r1 (eq. 15360 bits RSA)   FS 256
TLS_DHE_RSA_WITH_CHACHA20_POLY1305_SHA256 (0xccaa)   DH 4096 bits   FS 256


Handshake Simulation
Android 4.4.2 RSA 4096 (SHA384)   TLS 1.2 TLS_ECDHE_RSA_WITH_AES_256_GCM_SHA384   ECDH secp521r1  FS
Android 5.0.0 RSA 4096 (SHA384)   TLS 1.2 TLS_ECDHE_RSA_WITH_AES_256_CBC_SHA   ECDH secp521r1  FS
Android 6.0 RSA 4096 (SHA384)   TLS 1.2 > http/1.1   TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH secp256r1  FS
Android 7.0 RSA 4096 (SHA384)   TLS 1.2 > http/1.1   TLS_ECDHE_RSA_WITH_CHACHA20_POLY1305_SHA256   ECDH x25519  FS
Android 8.0 RSA 4096 (SHA384)   TLS 1.2 > http/1.1   TLS_ECDHE_RSA_WITH_CHACHA20_POLY1305_SHA256   ECDH x25519  FS
Android 8.1 -   TLS 1.3 TLS_CHACHA20_POLY1305_SHA256   ECDH x25519  FS
Android 9.0 -   TLS 1.3 TLS_CHACHA20_POLY1305_SHA256   ECDH x25519  FS
BingPreview Jan 2015 RSA 4096 (SHA384)   TLS 1.2 TLS_ECDHE_RSA_WITH_AES_256_GCM_SHA384   ECDH secp521r1  FS
Chrome 49 / XP SP3 RSA 4096 (SHA384)   TLS 1.2 > http/1.1   TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH secp256r1  FS
Chrome 69 / Win 7  R RSA 4096 (SHA384)   TLS 1.2 > http/1.1   TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH x25519  FS
Chrome 70 / Win 10 -   TLS 1.3 TLS_AES_128_GCM_SHA256   ECDH x25519  FS
Chrome 80 / Win 10  R -   TLS 1.3 TLS_AES_128_GCM_SHA256   ECDH x25519  FS
Firefox 31.3.0 ESR / Win 7 RSA 4096 (SHA384)   TLS 1.2 TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH secp256r1  FS
Firefox 47 / Win 7  R RSA 4096 (SHA384)   TLS 1.2 > http/1.1   TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH secp256r1  FS
Firefox 49 / XP SP3 RSA 4096 (SHA384)   TLS 1.2 > http/1.1   TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH secp256r1  FS
Firefox 62 / Win 7  R RSA 4096 (SHA384)   TLS 1.2 > http/1.1   TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH x25519  FS
Firefox 73 / Win 10  R -   TLS 1.3 TLS_AES_128_GCM_SHA256   ECDH x25519  FS
Googlebot Feb 2018 RSA 4096 (SHA384)   TLS 1.2 TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH x25519  FS
IE 11 / Win 7  R RSA 4096 (SHA384)   TLS 1.2 TLS_ECDHE_RSA_WITH_AES_256_CBC_SHA384   ECDH secp256r1  FS
IE 11 / Win 8.1  R RSA 4096 (SHA384)   TLS 1.2 > http/1.1   TLS_ECDHE_RSA_WITH_AES_256_CBC_SHA384   ECDH secp256r1  FS
IE 11 / Win Phone 8.1  R RSA 4096 (SHA384)   TLS 1.2 > http/1.1   TLS_RSA_WITH_AES_128_CBC_SHA256  No FS
IE 11 / Win Phone 8.1 Update  R RSA 4096 (SHA384)   TLS 1.2 > http/1.1   TLS_ECDHE_RSA_WITH_AES_256_CBC_SHA384   ECDH secp256r1  FS
IE 11 / Win 10  R RSA 4096 (SHA384)   TLS 1.2 > http/1.1   TLS_ECDHE_RSA_WITH_AES_256_GCM_SHA384   ECDH secp256r1  FS
Edge 15 / Win 10  R RSA 4096 (SHA384)   TLS 1.2 > http/1.1   TLS_ECDHE_RSA_WITH_AES_256_GCM_SHA384   ECDH x25519  FS
Edge 16 / Win 10  R RSA 4096 (SHA384)   TLS 1.2 > http/1.1   TLS_ECDHE_RSA_WITH_AES_256_GCM_SHA384   ECDH x25519  FS
Edge 18 / Win 10  R RSA 4096 (SHA384)   TLS 1.2 > http/1.1   TLS_ECDHE_RSA_WITH_AES_256_GCM_SHA384   ECDH x25519  FS
Edge 13 / Win Phone 10  R RSA 4096 (SHA384)   TLS 1.2 > http/1.1   TLS_ECDHE_RSA_WITH_AES_256_GCM_SHA384   ECDH secp256r1  FS
Java 8u161 RSA 4096 (SHA384)   TLS 1.2 TLS_ECDHE_RSA_WITH_AES_256_CBC_SHA384   ECDH secp256r1  FS
Java 11.0.3 -   TLS 1.3 TLS_AES_128_GCM_SHA256   ECDH secp256r1  FS
Java 12.0.1 -   TLS 1.3 TLS_AES_128_GCM_SHA256   ECDH secp256r1  FS
OpenSSL 1.0.1l  R RSA 4096 (SHA384)   TLS 1.2 TLS_ECDHE_RSA_WITH_AES_256_GCM_SHA384   ECDH secp521r1  FS
OpenSSL 1.0.2s  R RSA 4096 (SHA384)   TLS 1.2 TLS_ECDHE_RSA_WITH_AES_256_GCM_SHA384   ECDH secp256r1  FS
OpenSSL 1.1.0k  R RSA 4096 (SHA384)   TLS 1.2 TLS_ECDHE_RSA_WITH_AES_256_GCM_SHA384   ECDH x25519  FS
OpenSSL 1.1.1c  R -   TLS 1.3 TLS_AES_256_GCM_SHA384   ECDH x25519  FS
Safari 6 / iOS 6.0.1 RSA 4096 (SHA384)   TLS 1.2 TLS_ECDHE_RSA_WITH_AES_256_CBC_SHA384   ECDH secp256r1  FS
Safari 7 / iOS 7.1  R RSA 4096 (SHA384)   TLS 1.2 TLS_ECDHE_RSA_WITH_AES_256_CBC_SHA384   ECDH secp256r1  FS
Safari 7 / OS X 10.9  R RSA 4096 (SHA384)   TLS 1.2 TLS_ECDHE_RSA_WITH_AES_256_CBC_SHA384   ECDH secp256r1  FS
Safari 8 / iOS 8.4  R RSA 4096 (SHA384)   TLS 1.2 TLS_ECDHE_RSA_WITH_AES_256_CBC_SHA384   ECDH secp256r1  FS
Safari 8 / OS X 10.10  R RSA 4096 (SHA384)   TLS 1.2 TLS_ECDHE_RSA_WITH_AES_256_CBC_SHA384   ECDH secp256r1  FS
Safari 9 / iOS 9  R RSA 4096 (SHA384)   TLS 1.2 > http/1.1   TLS_ECDHE_RSA_WITH_AES_256_GCM_SHA384   ECDH secp256r1  FS
Safari 9 / OS X 10.11  R RSA 4096 (SHA384)   TLS 1.2 > http/1.1   TLS_ECDHE_RSA_WITH_AES_256_GCM_SHA384   ECDH secp256r1  FS
Safari 10 / iOS 10  R RSA 4096 (SHA384)   TLS 1.2 > http/1.1   TLS_ECDHE_RSA_WITH_AES_256_GCM_SHA384   ECDH secp256r1  FS
Safari 10 / OS X 10.12  R RSA 4096 (SHA384)   TLS 1.2 > http/1.1   TLS_ECDHE_RSA_WITH_AES_256_GCM_SHA384   ECDH secp256r1  FS
Safari 12.1.2 / MacOS 10.14.6 Beta  R -   TLS 1.3 TLS_CHACHA20_POLY1305_SHA256   ECDH x25519  FS
Safari 12.1.1 / iOS 12.3.1  R -   TLS 1.3 TLS_CHACHA20_POLY1305_SHA256   ECDH x25519  FS
Apple ATS 9 / iOS 9  R RSA 4096 (SHA384)   TLS 1.2 > http/1.1   TLS_ECDHE_RSA_WITH_AES_256_GCM_SHA384   ECDH secp256r1  FS
Yahoo Slurp Jan 2015 RSA 4096 (SHA384)   TLS 1.2 TLS_ECDHE_RSA_WITH_AES_256_GCM_SHA384   ECDH secp384r1  FS
YandexBot Jan 2015 RSA 4096 (SHA384)   TLS 1.2 TLS_ECDHE_RSA_WITH_AES_256_GCM_SHA384   ECDH secp521r1  FS
# Not simulated clients (Protocol mismatch)
Android 2.3.7   No SNI 2 Protocol mismatch (not simulated)
Android 4.0.4 Protocol mismatch (not simulated)
Android 4.1.1 Protocol mismatch (not simulated)
Android 4.2.2 Protocol mismatch (not simulated)
Android 4.3 Protocol mismatch (not simulated)
Baidu Jan 2015 Protocol mismatch (not simulated)
IE 6 / XP   No FS 1   No SNI 2 Protocol mismatch (not simulated)
IE 7 / Vista Protocol mismatch (not simulated)
IE 8 / XP   No FS 1   No SNI 2 Protocol mismatch (not simulated)
IE 8-10 / Win 7  R Protocol mismatch (not simulated)
IE 10 / Win Phone 8.0 Protocol mismatch (not simulated)
Java 6u45   No SNI 2 Protocol mismatch (not simulated)
Java 7u25 Protocol mismatch (not simulated)
OpenSSL 0.9.8y Protocol mismatch (not simulated)
Safari 5.1.9 / OS X 10.6.8 Protocol mismatch (not simulated)
Safari 6.0.4 / OS X 10.8.4  R Protocol mismatch (not simulated)

Click here to expand

(1) Clients that do not support Forward Secrecy (FS) are excluded when determining support for it.
(2) No support for virtual SSL hosting (SNI). Connects to the default site if the server uses SNI.
(3) Only first connection attempt simulated. Browsers sometimes retry with a lower protocol version.
(R) Denotes a reference browser or client, with which we expect better effective security.
(All) We use defaults, but some platforms do not use their best protocols and features (e.g., Java 6 & 7, older IE).
(All) Certificate trust is not checked in handshake simulation, we only perform TLS handshake.


Protocol Details
Secure Renegotiation Supported
Secure Client-Initiated Renegotiation No
Insecure Client-Initiated Renegotiation No
BEAST attack Mitigated server-side (more info)  
POODLE (SSLv3) No, SSL 3 not supported (more info)
POODLE (TLS) No (more info)
Zombie POODLE No (more info)   TLS 1.2 : 0x002f
GOLDENDOODLE No (more info)   TLS 1.2 : 0x002f
OpenSSL 0-Length No (more info)   TLS 1.2 : 0x002f
Sleeping POODLE No (more info)   TLS 1.2 : 0x002f
Downgrade attack prevention Yes, TLS_FALLBACK_SCSV supported (more info)
SSL/TLS compression No
RC4 No
Heartbeat (extension) No
Heartbleed (vulnerability) No (more info)
Ticketbleed (vulnerability) No (more info)
OpenSSL CCS vuln. (CVE-2014-0224) No (more info)
OpenSSL Padding Oracle vuln.
(CVE-2016-2107)
No (more info)
ROBOT (vulnerability) No (more info)
Forward Secrecy With some browsers (more info)
ALPN Yes   http/1.1
NPN No
Session resumption (caching) Yes
Session resumption (tickets) Yes
OCSP stapling No
Strict Transport Security (HSTS) Yes
max-age=63072000; includeSubDomains
HSTS Preloading Not in: Chrome  Edge  Firefox  IE 
Public Key Pinning (HPKP) No (more info)
Public Key Pinning Report-Only No
Public Key Pinning (Static) No (more info)
Long handshake intolerance No
TLS extension intolerance No
TLS version intolerance No
Incorrect SNI alerts No
Uses common DH primes No
DH public server param (Ys) reuse No
ECDH public server param reuse No
Supported Named Groups secp256r1, secp384r1, secp521r1, x25519, x448 (Server has no preference)
SSL 2 handshake compatibility No
0-RTT enabled No


HTTP Requests
1 https://drumsproject.eu/  (HTTP/1.1 200 OK)
1
Date Mon, 22 Sep 2025 12:22:01 GMT
Server Apache/2.4.52 (Ubuntu)
Strict-Transport-Security max-age=63072000; includeSubDomains
Link <https://drumsproject.eu/wp-json/>; rel="https://api.w.org/"
Link <https://drumsproject.eu/wp-json/wp/v2/pages/1105>; rel="alternate"; title="JSON"; type="application/json"
Link <https://drumsproject.eu/>; rel=shortlink
Vary Accept-Encoding
Content-Security-Policy frame-ancestors 'self' X-Frame-Options: DENY;
Connection close
Transfer-Encoding chunked
Content-Type text/html; charset=UTF-8


Miscellaneous
Test date Mon, 22 Sep 2025 12:21:51 UTC
Test duration 136.552 seconds
HTTP status code 200
HTTP server signature Apache/2.4.52 (Ubuntu)
Server hostname drums.bime.de


SSL Report v2.4.1