SSL Report: test.idreamsproject.eu (52.210.250.27)
Assessed on:  Mon, 29 Sep 2025 07:27:21 UTC | Clear cache

Due to a recently discovered bug in Apple's code, your browser is exposed to MITM attacks. Click here for more information.

Summary
Overall Rating
A+
0
20
40
60
80
100
Certificate
 
Protocol Support
 
Key Exchange
 
Cipher Strength
 

Visit our documentation page for more information, configuration guides, and books. Known issues are documented here.
This site works only in browsers with SNI support.
This server supports TLS 1.3.  MORE INFO »
HTTP Strict Transport Security (HSTS) with long duration deployed on this server.  MORE INFO »
Certificate #1: RSA 2048 bits (SHA256withRSA)
Server Key and Certificate #1
Subject test.idreamsproject.eu
Fingerprint SHA256: 103051c92163bea6550d06ed857f4b8c5b74bbba39baa37d0c3f158f0198a444
Pin SHA256: pwxdoqSKS2UbYt1LKu3Ti2/i0sdolZwbR/JjluGOo94=
Common names test.idreamsproject.eu
Alternative names test.idreamsproject.eu
Serial Number 0565e3174ef8d552131bc32a00ec9833b564
Valid from Mon, 25 Aug 2025 02:11:38 UTC
Valid until Sun, 23 Nov 2025 02:11:37 UTC (expires in 1 month and 24 days)
Key RSA 2048 bits (e 65537)
Weak key (Debian) No
Issuer R12
AIA: http://r12.i.lencr.org/
Signature algorithm SHA256withRSA
Extended Validation No
Certificate Transparency Yes (certificate)
OCSP Must Staple No
Revocation information CRL
CRL: http://r12.c.lencr.org/101.crl
Revocation status Validation error
CRL ERROR: IOException occurred
DNS CAA No (more info)
Trusted Yes
Mozilla  Apple  Android  Java  Windows 


Additional Certificates (if supplied)
Certificates provided 2 (2583 bytes)
Chain issues None
#2
Subject R12
Fingerprint SHA256: 131fce7784016899a5a00203a9efc80f18ebbd75580717edc1553580930836ec
Pin SHA256: kZwN96eHtZftBWrOZUsd6cA4es80n3NzSk/XtYz2EqQ=
Valid until Fri, 12 Mar 2027 23:59:59 UTC (expires in 1 year and 5 months)
Key RSA 2048 bits (e 65537)
Issuer ISRG Root X1
Signature algorithm SHA256withRSA


Certification Paths
Path #1: Trusted
1 Sent by server test.idreamsproject.eu
Fingerprint SHA256: 103051c92163bea6550d06ed857f4b8c5b74bbba39baa37d0c3f158f0198a444
Pin SHA256: pwxdoqSKS2UbYt1LKu3Ti2/i0sdolZwbR/JjluGOo94=

RSA 2048 bits (e 65537) / SHA256withRSA
CRL ERROR: IOException occurred
2 Sent by server R12
Fingerprint SHA256: 131fce7784016899a5a00203a9efc80f18ebbd75580717edc1553580930836ec
Pin SHA256: kZwN96eHtZftBWrOZUsd6cA4es80n3NzSk/XtYz2EqQ=

RSA 2048 bits (e 65537) / SHA256withRSA
CRL ERROR: IOException occurred
3 In trust store ISRG Root X1   Self-signed
Fingerprint SHA256: 96bcec06264976f37460779acf28c5a7cfe8a3c0aae11a8ffcee05c0bddf08c6
Pin SHA256: C5+lpZ7tcVwmwQIMcRtPbsQtWLABXhQzejna0wHFr8M=

RSA 4096 bits (e 65537) / SHA256withRSA
Path #1: Trusted
1 Sent by server test.idreamsproject.eu
Fingerprint SHA256: 103051c92163bea6550d06ed857f4b8c5b74bbba39baa37d0c3f158f0198a444
Pin SHA256: pwxdoqSKS2UbYt1LKu3Ti2/i0sdolZwbR/JjluGOo94=

RSA 2048 bits (e 65537) / SHA256withRSA
CRL ERROR: IOException occurred
2 Sent by server R12
Fingerprint SHA256: 131fce7784016899a5a00203a9efc80f18ebbd75580717edc1553580930836ec
Pin SHA256: kZwN96eHtZftBWrOZUsd6cA4es80n3NzSk/XtYz2EqQ=

RSA 2048 bits (e 65537) / SHA256withRSA
CRL ERROR: IOException occurred
3 In trust store ISRG Root X1   Self-signed
Fingerprint SHA256: 96bcec06264976f37460779acf28c5a7cfe8a3c0aae11a8ffcee05c0bddf08c6
Pin SHA256: C5+lpZ7tcVwmwQIMcRtPbsQtWLABXhQzejna0wHFr8M=

RSA 4096 bits (e 65537) / SHA256withRSA
Path #1: Trusted
1 Sent by server test.idreamsproject.eu
Fingerprint SHA256: 103051c92163bea6550d06ed857f4b8c5b74bbba39baa37d0c3f158f0198a444
Pin SHA256: pwxdoqSKS2UbYt1LKu3Ti2/i0sdolZwbR/JjluGOo94=

RSA 2048 bits (e 65537) / SHA256withRSA
CRL ERROR: IOException occurred
2 Sent by server R12
Fingerprint SHA256: 131fce7784016899a5a00203a9efc80f18ebbd75580717edc1553580930836ec
Pin SHA256: kZwN96eHtZftBWrOZUsd6cA4es80n3NzSk/XtYz2EqQ=

RSA 2048 bits (e 65537) / SHA256withRSA
CRL ERROR: IOException occurred
3 In trust store ISRG Root X1   Self-signed
Fingerprint SHA256: 96bcec06264976f37460779acf28c5a7cfe8a3c0aae11a8ffcee05c0bddf08c6
Pin SHA256: C5+lpZ7tcVwmwQIMcRtPbsQtWLABXhQzejna0wHFr8M=

RSA 4096 bits (e 65537) / SHA256withRSA
Path #1: Trusted
1 Sent by server test.idreamsproject.eu
Fingerprint SHA256: 103051c92163bea6550d06ed857f4b8c5b74bbba39baa37d0c3f158f0198a444
Pin SHA256: pwxdoqSKS2UbYt1LKu3Ti2/i0sdolZwbR/JjluGOo94=

RSA 2048 bits (e 65537) / SHA256withRSA
CRL ERROR: IOException occurred
2 Sent by server R12
Fingerprint SHA256: 131fce7784016899a5a00203a9efc80f18ebbd75580717edc1553580930836ec
Pin SHA256: kZwN96eHtZftBWrOZUsd6cA4es80n3NzSk/XtYz2EqQ=

RSA 2048 bits (e 65537) / SHA256withRSA
CRL ERROR: IOException occurred
3 In trust store ISRG Root X1   Self-signed
Fingerprint SHA256: 96bcec06264976f37460779acf28c5a7cfe8a3c0aae11a8ffcee05c0bddf08c6
Pin SHA256: C5+lpZ7tcVwmwQIMcRtPbsQtWLABXhQzejna0wHFr8M=

RSA 4096 bits (e 65537) / SHA256withRSA
Path #1: Trusted
1 Sent by server test.idreamsproject.eu
Fingerprint SHA256: 103051c92163bea6550d06ed857f4b8c5b74bbba39baa37d0c3f158f0198a444
Pin SHA256: pwxdoqSKS2UbYt1LKu3Ti2/i0sdolZwbR/JjluGOo94=

RSA 2048 bits (e 65537) / SHA256withRSA
CRL ERROR: IOException occurred
2 Sent by server R12
Fingerprint SHA256: 131fce7784016899a5a00203a9efc80f18ebbd75580717edc1553580930836ec
Pin SHA256: kZwN96eHtZftBWrOZUsd6cA4es80n3NzSk/XtYz2EqQ=

RSA 2048 bits (e 65537) / SHA256withRSA
CRL ERROR: IOException occurred
3 In trust store ISRG Root X1   Self-signed
Fingerprint SHA256: 96bcec06264976f37460779acf28c5a7cfe8a3c0aae11a8ffcee05c0bddf08c6
Pin SHA256: C5+lpZ7tcVwmwQIMcRtPbsQtWLABXhQzejna0wHFr8M=

RSA 4096 bits (e 65537) / SHA256withRSA

Click here to expand

Certificate #2: RSA 2048 bits (SHA256withRSA)
Server Key and Certificate #1
Subject dev.idreamsproject.eu
Fingerprint SHA256: f109a8b0b22cda3f00106e67e1dc22c318b00e9e212664a756b5d2c124791968
Pin SHA256: uQQo2KWoC+Vccl+QwrBxuNdChqD5JCZSmK1p4iTdpB8=
Common names dev.idreamsproject.eu
Alternative names dev.idreamsproject.eu   MISMATCH
Serial Number 057b60141167018cbe13af8be536dbfef8bd
Valid from Thu, 25 Sep 2025 02:16:38 UTC
Valid until Wed, 24 Dec 2025 02:16:37 UTC (expires in 2 months and 24 days)
Key RSA 2048 bits (e 65537)
Weak key (Debian) No
Issuer R13
AIA: http://r13.i.lencr.org/
Signature algorithm SHA256withRSA
Extended Validation No
Certificate Transparency Yes (certificate)
OCSP Must Staple No
Revocation information CRL
CRL: http://r13.c.lencr.org/62.crl
Revocation status Validation error
CRL ERROR: IOException occurred
Trusted No   NOT TRUSTED
Mozilla  Apple  Android  Java  Windows 


Additional Certificates (if supplied)
Certificates provided 2 (2577 bytes)
Chain issues None
#2
Subject R13
Fingerprint SHA256: d3b128216a843f8ef1321501f5df52a5df52939ee2c19297712cd3de4d419354
Pin SHA256: AlSQhgtJirc8ahLyekmtX+Iw+v46yPYRLJt9Cq1GlB0=
Valid until Fri, 12 Mar 2027 23:59:59 UTC (expires in 1 year and 5 months)
Key RSA 2048 bits (e 65537)
Issuer ISRG Root X1
Signature algorithm SHA256withRSA


Certification Paths
Path #1: Not trusted (invalid certificate [Fingerprint SHA256: f109a8b0b22cda3f00106e67e1dc22c318b00e9e212664a756b5d2c124791968])
1 Sent by server dev.idreamsproject.eu
Fingerprint SHA256: f109a8b0b22cda3f00106e67e1dc22c318b00e9e212664a756b5d2c124791968
Pin SHA256: uQQo2KWoC+Vccl+QwrBxuNdChqD5JCZSmK1p4iTdpB8=

RSA 2048 bits (e 65537) / SHA256withRSA
CRL ERROR: IOException occurred
2 Sent by server R13
Fingerprint SHA256: d3b128216a843f8ef1321501f5df52a5df52939ee2c19297712cd3de4d419354
Pin SHA256: AlSQhgtJirc8ahLyekmtX+Iw+v46yPYRLJt9Cq1GlB0=

RSA 2048 bits (e 65537) / SHA256withRSA
CRL ERROR: IOException occurred
3 In trust store ISRG Root X1   Self-signed
Fingerprint SHA256: 96bcec06264976f37460779acf28c5a7cfe8a3c0aae11a8ffcee05c0bddf08c6
Pin SHA256: C5+lpZ7tcVwmwQIMcRtPbsQtWLABXhQzejna0wHFr8M=

RSA 4096 bits (e 65537) / SHA256withRSA
Path #1: Not trusted (invalid certificate [Fingerprint SHA256: f109a8b0b22cda3f00106e67e1dc22c318b00e9e212664a756b5d2c124791968])
1 Sent by server dev.idreamsproject.eu
Fingerprint SHA256: f109a8b0b22cda3f00106e67e1dc22c318b00e9e212664a756b5d2c124791968
Pin SHA256: uQQo2KWoC+Vccl+QwrBxuNdChqD5JCZSmK1p4iTdpB8=

RSA 2048 bits (e 65537) / SHA256withRSA
CRL ERROR: IOException occurred
2 Sent by server R13
Fingerprint SHA256: d3b128216a843f8ef1321501f5df52a5df52939ee2c19297712cd3de4d419354
Pin SHA256: AlSQhgtJirc8ahLyekmtX+Iw+v46yPYRLJt9Cq1GlB0=

RSA 2048 bits (e 65537) / SHA256withRSA
CRL ERROR: IOException occurred
3 In trust store ISRG Root X1   Self-signed
Fingerprint SHA256: 96bcec06264976f37460779acf28c5a7cfe8a3c0aae11a8ffcee05c0bddf08c6
Pin SHA256: C5+lpZ7tcVwmwQIMcRtPbsQtWLABXhQzejna0wHFr8M=

RSA 4096 bits (e 65537) / SHA256withRSA
Path #1: Not trusted (invalid certificate [Fingerprint SHA256: f109a8b0b22cda3f00106e67e1dc22c318b00e9e212664a756b5d2c124791968])
1 Sent by server dev.idreamsproject.eu
Fingerprint SHA256: f109a8b0b22cda3f00106e67e1dc22c318b00e9e212664a756b5d2c124791968
Pin SHA256: uQQo2KWoC+Vccl+QwrBxuNdChqD5JCZSmK1p4iTdpB8=

RSA 2048 bits (e 65537) / SHA256withRSA
CRL ERROR: IOException occurred
2 Sent by server R13
Fingerprint SHA256: d3b128216a843f8ef1321501f5df52a5df52939ee2c19297712cd3de4d419354
Pin SHA256: AlSQhgtJirc8ahLyekmtX+Iw+v46yPYRLJt9Cq1GlB0=

RSA 2048 bits (e 65537) / SHA256withRSA
CRL ERROR: IOException occurred
3 In trust store ISRG Root X1   Self-signed
Fingerprint SHA256: 96bcec06264976f37460779acf28c5a7cfe8a3c0aae11a8ffcee05c0bddf08c6
Pin SHA256: C5+lpZ7tcVwmwQIMcRtPbsQtWLABXhQzejna0wHFr8M=

RSA 4096 bits (e 65537) / SHA256withRSA
Path #1: Not trusted (invalid certificate [Fingerprint SHA256: f109a8b0b22cda3f00106e67e1dc22c318b00e9e212664a756b5d2c124791968])
1 Sent by server dev.idreamsproject.eu
Fingerprint SHA256: f109a8b0b22cda3f00106e67e1dc22c318b00e9e212664a756b5d2c124791968
Pin SHA256: uQQo2KWoC+Vccl+QwrBxuNdChqD5JCZSmK1p4iTdpB8=

RSA 2048 bits (e 65537) / SHA256withRSA
CRL ERROR: IOException occurred
2 Sent by server R13
Fingerprint SHA256: d3b128216a843f8ef1321501f5df52a5df52939ee2c19297712cd3de4d419354
Pin SHA256: AlSQhgtJirc8ahLyekmtX+Iw+v46yPYRLJt9Cq1GlB0=

RSA 2048 bits (e 65537) / SHA256withRSA
CRL ERROR: IOException occurred
3 In trust store ISRG Root X1   Self-signed
Fingerprint SHA256: 96bcec06264976f37460779acf28c5a7cfe8a3c0aae11a8ffcee05c0bddf08c6
Pin SHA256: C5+lpZ7tcVwmwQIMcRtPbsQtWLABXhQzejna0wHFr8M=

RSA 4096 bits (e 65537) / SHA256withRSA
Path #1: Not trusted (invalid certificate [Fingerprint SHA256: f109a8b0b22cda3f00106e67e1dc22c318b00e9e212664a756b5d2c124791968])
1 Sent by server dev.idreamsproject.eu
Fingerprint SHA256: f109a8b0b22cda3f00106e67e1dc22c318b00e9e212664a756b5d2c124791968
Pin SHA256: uQQo2KWoC+Vccl+QwrBxuNdChqD5JCZSmK1p4iTdpB8=

RSA 2048 bits (e 65537) / SHA256withRSA
CRL ERROR: IOException occurred
2 Sent by server R13
Fingerprint SHA256: d3b128216a843f8ef1321501f5df52a5df52939ee2c19297712cd3de4d419354
Pin SHA256: AlSQhgtJirc8ahLyekmtX+Iw+v46yPYRLJt9Cq1GlB0=

RSA 2048 bits (e 65537) / SHA256withRSA
CRL ERROR: IOException occurred
3 In trust store ISRG Root X1   Self-signed
Fingerprint SHA256: 96bcec06264976f37460779acf28c5a7cfe8a3c0aae11a8ffcee05c0bddf08c6
Pin SHA256: C5+lpZ7tcVwmwQIMcRtPbsQtWLABXhQzejna0wHFr8M=

RSA 4096 bits (e 65537) / SHA256withRSA

Click here to expand

Click here to expand

Configuration
Protocols
TLS 1.3 Yes
TLS 1.2 Yes*
TLS 1.1 No
TLS 1.0 No
SSL 3 No
SSL 2 No
(*) Experimental: Server negotiated using No-SNI


Cipher Suites
# TLS 1.3 (suites in server-preferred order)
TLS_AES_256_GCM_SHA384 (0x1302)   ECDH x25519 (eq. 3072 bits RSA)   FS 256
TLS_CHACHA20_POLY1305_SHA256 (0x1303)   ECDH x25519 (eq. 3072 bits RSA)   FS 256
TLS_AES_128_GCM_SHA256 (0x1301)   ECDH x25519 (eq. 3072 bits RSA)   FS 128
# TLS 1.2 (suites in server-preferred order)
TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256 (0xc02f)   ECDH x25519 (eq. 3072 bits RSA)   FS 128
TLS_ECDHE_RSA_WITH_AES_256_GCM_SHA384 (0xc030)   ECDH x25519 (eq. 3072 bits RSA)   FS 256
TLS_ECDHE_RSA_WITH_CHACHA20_POLY1305_SHA256 (0xcca8)   ECDH x25519 (eq. 3072 bits RSA)   FS 256


Handshake Simulation
Android 4.4.2 RSA 2048 (SHA256)   TLS 1.2 TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH secp256r1  FS
Android 5.0.0 RSA 2048 (SHA256)   TLS 1.2 TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH secp256r1  FS
Android 6.0 RSA 2048 (SHA256)   TLS 1.2 > http/1.1   TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH secp256r1  FS
Android 7.0 RSA 2048 (SHA256)   TLS 1.2 > h2   TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH x25519  FS
Android 8.0 RSA 2048 (SHA256)   TLS 1.2 > h2   TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH x25519  FS
Android 8.1 -   TLS 1.3 TLS_AES_256_GCM_SHA384   ECDH x25519  FS
Android 9.0 -   TLS 1.3 TLS_AES_256_GCM_SHA384   ECDH x25519  FS
BingPreview Jan 2015 RSA 2048 (SHA256)   TLS 1.2 TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH secp256r1  FS
Chrome 49 / XP SP3 RSA 2048 (SHA256)   TLS 1.2 > h2   TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH secp256r1  FS
Chrome 69 / Win 7  R RSA 2048 (SHA256)   TLS 1.2 > h2   TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH x25519  FS
Chrome 70 / Win 10 -   TLS 1.3 TLS_AES_256_GCM_SHA384   ECDH x25519  FS
Chrome 80 / Win 10  R -   TLS 1.3 TLS_AES_256_GCM_SHA384   ECDH x25519  FS
Firefox 31.3.0 ESR / Win 7 RSA 2048 (SHA256)   TLS 1.2 TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH secp256r1  FS
Firefox 47 / Win 7  R RSA 2048 (SHA256)   TLS 1.2 > h2   TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH secp256r1  FS
Firefox 49 / XP SP3 RSA 2048 (SHA256)   TLS 1.2 > h2   TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH secp256r1  FS
Firefox 62 / Win 7  R RSA 2048 (SHA256)   TLS 1.2 > h2   TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH x25519  FS
Firefox 73 / Win 10  R -   TLS 1.3 TLS_AES_256_GCM_SHA384   ECDH x25519  FS
Googlebot Feb 2018 RSA 2048 (SHA256)   TLS 1.2 TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH x25519  FS
IE 11 / Win 7  R Server sent fatal alert: handshake_failure
IE 11 / Win 8.1  R Server sent fatal alert: handshake_failure
IE 11 / Win Phone 8.1  R Server sent fatal alert: handshake_failure
IE 11 / Win Phone 8.1 Update  R Server sent fatal alert: handshake_failure
IE 11 / Win 10  R RSA 2048 (SHA256)   TLS 1.2 > h2   TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH secp256r1  FS
Edge 15 / Win 10  R RSA 2048 (SHA256)   TLS 1.2 > h2   TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH x25519  FS
Edge 16 / Win 10  R RSA 2048 (SHA256)   TLS 1.2 > h2   TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH x25519  FS
Edge 18 / Win 10  R RSA 2048 (SHA256)   TLS 1.2 > h2   TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH x25519  FS
Edge 13 / Win Phone 10  R RSA 2048 (SHA256)   TLS 1.2 > h2   TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH secp256r1  FS
Java 8u161 RSA 2048 (SHA256)   TLS 1.2 TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH secp256r1  FS
Java 11.0.3 -   TLS 1.3 TLS_AES_256_GCM_SHA384   ECDH secp256r1  FS
Java 12.0.1 -   TLS 1.3 TLS_AES_256_GCM_SHA384   ECDH secp256r1  FS
OpenSSL 1.0.1l  R RSA 2048 (SHA256)   TLS 1.2 TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH secp256r1  FS
OpenSSL 1.0.2s  R RSA 2048 (SHA256)   TLS 1.2 TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH secp256r1  FS
OpenSSL 1.1.0k  R RSA 2048 (SHA256)   TLS 1.2 TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH x25519  FS
OpenSSL 1.1.1c  R -   TLS 1.3 TLS_AES_256_GCM_SHA384   ECDH x25519  FS
Safari 6 / iOS 6.0.1 Server sent fatal alert: handshake_failure
Safari 7 / iOS 7.1  R Server sent fatal alert: handshake_failure
Safari 7 / OS X 10.9  R Server sent fatal alert: handshake_failure
Safari 8 / iOS 8.4  R Server sent fatal alert: handshake_failure
Safari 8 / OS X 10.10  R Server sent fatal alert: handshake_failure
Safari 9 / iOS 9  R RSA 2048 (SHA256)   TLS 1.2 > h2   TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH secp256r1  FS
Safari 9 / OS X 10.11  R RSA 2048 (SHA256)   TLS 1.2 > h2   TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH secp256r1  FS
Safari 10 / iOS 10  R RSA 2048 (SHA256)   TLS 1.2 > h2   TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH secp256r1  FS
Safari 10 / OS X 10.12  R RSA 2048 (SHA256)   TLS 1.2 > h2   TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH secp256r1  FS
Safari 12.1.2 / MacOS 10.14.6 Beta  R -   TLS 1.3 TLS_AES_256_GCM_SHA384   ECDH x25519  FS
Safari 12.1.1 / iOS 12.3.1  R -   TLS 1.3 TLS_AES_256_GCM_SHA384   ECDH x25519  FS
Apple ATS 9 / iOS 9  R RSA 2048 (SHA256)   TLS 1.2 > h2   TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH secp256r1  FS
Yahoo Slurp Jan 2015 RSA 2048 (SHA256)   TLS 1.2 TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH secp256r1  FS
YandexBot Jan 2015 RSA 2048 (SHA256)   TLS 1.2 TLS_ECDHE_RSA_WITH_AES_128_GCM_SHA256   ECDH secp256r1  FS
# Not simulated clients (Protocol mismatch)
Android 2.3.7   No SNI 2 Protocol mismatch (not simulated)
Android 4.0.4 Protocol mismatch (not simulated)
Android 4.1.1 Protocol mismatch (not simulated)
Android 4.2.2 Protocol mismatch (not simulated)
Android 4.3 Protocol mismatch (not simulated)
Baidu Jan 2015 Protocol mismatch (not simulated)
IE 6 / XP   No FS 1   No SNI 2 Protocol mismatch (not simulated)
IE 7 / Vista Protocol mismatch (not simulated)
IE 8 / XP   No FS 1   No SNI 2 Protocol mismatch (not simulated)
IE 8-10 / Win 7  R Protocol mismatch (not simulated)
IE 10 / Win Phone 8.0 Protocol mismatch (not simulated)
Java 6u45   No SNI 2 Protocol mismatch (not simulated)
Java 7u25 Protocol mismatch (not simulated)
OpenSSL 0.9.8y Protocol mismatch (not simulated)
Safari 5.1.9 / OS X 10.6.8 Protocol mismatch (not simulated)
Safari 6.0.4 / OS X 10.8.4  R Protocol mismatch (not simulated)

Click here to expand

(1) Clients that do not support Forward Secrecy (FS) are excluded when determining support for it.
(2) No support for virtual SSL hosting (SNI). Connects to the default site if the server uses SNI.
(3) Only first connection attempt simulated. Browsers sometimes retry with a lower protocol version.
(R) Denotes a reference browser or client, with which we expect better effective security.
(All) We use defaults, but some platforms do not use their best protocols and features (e.g., Java 6 & 7, older IE).
(All) Certificate trust is not checked in handshake simulation, we only perform TLS handshake.


Protocol Details
Secure Renegotiation Supported
Secure Client-Initiated Renegotiation No
Insecure Client-Initiated Renegotiation No
BEAST attack Mitigated server-side (more info)  
POODLE (SSLv3) No, SSL 3 not supported (more info)
POODLE (TLS) No (more info)
Zombie POODLE No (more info)  
GOLDENDOODLE No (more info)  
OpenSSL 0-Length No (more info)  
Sleeping POODLE No (more info)  
Downgrade attack prevention Yes, TLS_FALLBACK_SCSV supported (more info)
SSL/TLS compression No
RC4 No
Heartbeat (extension) No
Heartbleed (vulnerability) No (more info)
Ticketbleed (vulnerability) No (more info)
OpenSSL CCS vuln. (CVE-2014-0224) No (more info)
OpenSSL Padding Oracle vuln.
(CVE-2016-2107)
No (more info)
ROBOT (vulnerability) No (more info)
Forward Secrecy Yes (with most browsers)   ROBUST (more info)
ALPN Yes   h2 http/1.1
NPN No
Session resumption (caching) Yes
Session resumption (tickets) Yes
OCSP stapling No
Strict Transport Security (HSTS) Yes
max-age=63072000; includeSubDomains; preload
HSTS Preloading Not in: Chrome  Edge  Firefox  IE 
Public Key Pinning (HPKP) No (more info)
Public Key Pinning Report-Only No
Public Key Pinning (Static) No (more info)
Long handshake intolerance No
TLS extension intolerance No
TLS version intolerance No
Incorrect SNI alerts No
Uses common DH primes No, DHE suites not supported
DH public server param (Ys) reuse No, DHE suites not supported
ECDH public server param reuse No
Supported Named Groups x25519, secp256r1, secp384r1 (server preferred order)
SSL 2 handshake compatibility No
0-RTT enabled No


HTTP Requests
1 https://test.idreamsproject.eu/  (HTTP/1.1 502 Bad Gateway)
1
Server nginx
Date Mon, 29 Sep 2025 07:26:33 GMT
Content-Type text/html
Content-Length 150
Connection close
Strict-Transport-Security max-age=63072000; includeSubDomains; preload


Miscellaneous
Test date Mon, 29 Sep 2025 07:26:20 UTC
Test duration 60.872 seconds
HTTP status code 502
HTTP server signature nginx
Server hostname ec2-52-210-250-27.eu-west-1.compute.amazonaws.com


SSL Report v2.4.1